Bridge Crane for Tube Reactor Handling
Lifting Capacity 5~800 ton
Lifting Height 12-22 meter
Span 10.5~31.5 meter
Working Duty A5-A6
Ambient Temperature -20~40℃
Lifting Capacity 5~800 ton
Lifting Height 12-22 meter
Span 10.5~31.5 meter
Working Duty A5-A6
Ambient Temperature -20~40℃
Lifting Capacity: 75t~320t
Span: 10m~40m
Lifting Height: 15m-30m
Work Level: A7~A8
Type:QD
LiftingCapacity:5~800ton
LiftingHeight:12-22meter
Span:10.5~31.5meter
WorkingDuty:A5-A6
AmbientTemperature:-20~40℃
The main structure includes main beams, trolley traveling mechanism, electric trolley, hoisting mechanism, etc. Two double beams are the main supporting structure. With high quality steel, they have a strong frame that can withstand high pressure and bending when lifting heavy loads.
The video shows the assembly of Weihua crane trolley including assembly of trolley frame, reducer, motor, reel drum, brake, hoist limiter, etc.
The video shows the assembly of Weihua crane trolley including assembly of trolley frame, reducer, motor, reel drum, brake, hoist limiter, etc.